Full Report

 Summary

 PDF 

201
29
Items Inspected
Recommendations
 1 – Inspection Detail
General Inspection Info: In Attendance
Builder, Home Inspector

Having a client in attendance for a review at the end of an inspection is recommended discuss concerns, and answer all questions in person. This will allow for a physical walkthrough of any reported concerns.

General Inspection Info: Occupancy
Vacant
General Inspection Info: Weather Conditions
Sunny, 81-100 Degrees
General Inspection Info: Type of Building
Single Family
Purpose and Scope

The inspection is supplemental to the Property Disclosure. It is the responsibility of the Client to obtain any and all disclosure forms relative to this real estate transaction. This document was prepared as a report of all visual defects noted at the time and date of the inspection. It is not necessarily an all-inclusive summary, as additional testing or inspection information/processes and analysis may be pending. It is subject to all terms and conditions specified in the Inspection Agreement. 

It should be noted that a standard property inspection is a visual assessment of the condition of the property at the time of inspection. The inspection and inspection report are offered as an opinion only, of items observed on the day of the inspection. Although every reasonable effort is made to discover and correctly interpret indications of previous or ongoing defects that may be present, it must be understood that no guarantee is expressed nor implied nor responsibility assumed by the inspector or inspection company. This firm endeavors to perform all inspections in substantial compliance with the inspection standards of practice of the International Association of Certified Home Inspectors (InterNACHI). 

Our inspectors inspect the readily accessible and installed components and systems of a property as follows: This report contains observations of those systems and components that are, in the professional opinion of the inspector authoring this report, significantly deficient or are near the end of their expected service life. If the cause for the deficiency is not readily apparent, the suspected cause or reason why the system or component is at or near end of expected service life is reported, and recommendations for correction or monitoring may be made as appropriate. When systems or components designated for inspection in the InterNACHI Standards are present but are not inspected, the reason the item was not inspected may be reported as well.

Agreement, Terms and Conditions

Acceptance or use of this Inspection Report shall constitute acceptance of and agreement to all of the provisions of the Agreement for Inspection Services and its Terms and Conditions which are attached to and form a part of this Inspection Report. The scope of the inspection is outlined in the Inspection Agreement, agreed to by the Client.

A Word About Contractors and 20-20 Hindsight

A common source of dissatisfaction with inspectors sometimes comes as a result of off-the cuff comments made by contractors (made after-the-fact), which often differ from ours. Don’t be surprised when someone says that something needed to be replaced when we said it needed to be repaired, replaced, upgraded, or monitored. Having something replaced may make more money for the contractor than just doing a repair. Contractors sometimes say, “I can’t believe you had this building inspected and they did not find this problem.” There may be several reasons for these apparent over sights:

Conditions during inspection—It is difficult for clients to remember the circumstances in the subject property at the time of the inspection. Clients seldom remember that there was storage everywhere, making things inaccessible, or that the air conditioning could not be turned on because it was less than 65° outside. Contractors do not know what the circumstances were when the inspection was performed.

The wisdom of hindsight—When a problem occurs, it is very easy to have 20/20 hindsight. Anybody can say that the roof is leaking when it is raining outside and the roof is leaking. In the midst of a hot, dry, or windy condition, it is virtually impossible to determine if the roof will leak the next time it rains. Predicting problems is not an exact science and is not part of the inspection process. We are only documenting the condition of the property at the time of the inspection.

A destructive or invasive examination—The inspection process is non-destructive, and is generally non-invasive. It is performed in this manner because, at the time we inspected the subject property, the Client did not own, rent, or lease it. A Client cannot authorize the disassembly or destruction of what does not belong to them. Now, if we spent half an hour under a sink, twisting valves and pulling on piping, or an hour disassembling a furnace, we may indeed find additional  problems. Of course, we could possibly CAUSE some problems in the process. Therein lies the quandary. We want to set your expectations as to what an inspection is, and what it not.

We are generalists—We are not acting as specialists in any specific trade. The heating and cooling contractor may indeed have more heating expertise than we do. This is because heating and cooling is all he’s expected to know. Inspectors are expected to know heating and cooling, plumbing, electricity, foundations, carpentry, roofing, appliances, etc. That’s why we’re generalists. We’re looking at the forest, not the individual trees.

Your Job As a Homeowner: What Really Matters in a Home Inspection

Now that you’ve bought your home and had your inspection, you may still have some questions about your new house and the items revealed in your report. 

Home maintenance is a primary responsibility for every homeowner, whether you’ve lived in several homes of your own or have just purchased your first one. Staying on top of a seasonal home maintenance schedule is important, and your InterNACHI Certified Professional Inspector can help you figure this out so that you never fall behind. Don’t let minor maintenance and routine repairs turn into expensive disasters later due to neglect or simply because you aren’t sure what needs to be done and when. 

Your home inspection report is a great place to start. In addition to the written report, checklists, photos, and what the inspector said during the inspection not to mention the sellers disclosure and what you noticed yourself it’s easy to become overwhelmed. However, it’s likely that your inspection report included mostly maintenance recommendations, the life expectancy for the home’s various systems and components, and minor imperfections. These are useful to know about. 

But the issues that really matter fall into four categories: 

  1. Major defects, such as a structural failure; 
  2. Things that can lead to major defects, such as a small leak due to a defective roof flashing; 
  3. Things that may hinder your ability to finance, legally occupy, or insure the home if not rectified immediately; and 
  4. Safety hazards, such as an exposed, live buss bar at the electrical panel. 

Anything in these categories should be addressed as soon as possible. Often, a serious problem can be corrected inexpensively to protect both life and property (especially in categories 2 and 4). 

Most sellers are honest and are often surprised to learn of defects uncovered during an inspection. It’s important to realize that sellers are under no obligation to repair everything mentioned in your inspection report. No house is perfect. Keep things in perspective as you move into your new home. 

And remember that homeownership is both a joyful experience and an important responsibility, so be sure to call on your InterNACHI Certified Professional Inspector to help you devise an annual maintenance plan that will keep your family safe and your home in good condition for years to come.

 

 

 

Your Job As a Homeowner: Schedule a Home Maintenance Inspection

Even the most vigilant homeowner can, from time to time, miss small problems or forget about performing some routine home repairs and seasonal maintenance. That’s why an Annual Home Maintenance Inspection will help you keep your home in good condition and prevent it from suffering serious, long-term and expensive damage from minor issues that should be addressed now. 

The most important thing to understand as a new homeowner is that your house requires care and regular maintenance. As time goes on, parts of your house will wear out, break down, deteriorate, leak, or simply stop working. But none of these issues means that you will have a costly disaster on your hands if you’re on top of home maintenance, and that includes hiring an expert once a year. 

Just as you regularly maintain your vehicle, consider getting an Annual Home Maintenance Inspection as part of the cost of upkeep for your most valuable investment your home. 

Your InterNACHI-Certified Professional Inspector can show you what you should look for so that you can be an informed homeowner. Protect your family’s health and safety, and enjoy your home for years to come by having an Annual Home Maintenance Inspection performed every year. 

Schedule next year’s maintenance inspection with your home inspector today!

 

Every house should be inspected every year as part of a homeowner’s routine home maintenance plan. Catch problems before they become major defects.

 

 

 

Details

InterNACHI is so certain of the integrity of our members that we back them up with our $10,000 Honor Guarantee. 

InterNACHI will pay up to $10,000 USD for the cost of replacement of personal property lost during an inspection and stolen by an InterNACHI-certified member who was convicted of or pleaded guilty to any criminal charge resulting from the member’s taking of the client’s personal property.  

For details, please visit www.nachi.org/honor

 

 2 – Roof
Roof General: Method of Evaluation
Walked Roof

We attempt to inspect the roof from various locations from the ground and, if possible, accessing the rooftop using a ladder. 

The inspection was not an exhaustive inspection of every installation detail of the roof system according to the manufacturer’s specifications or construction codes.  It is virtually impossible to detect a leak except as it is occurring or by specific water tests, which are beyond the scope of our inspection.  We recommend that you ask the sellers to disclose information about the roof, and that you include comprehensive roof coverage in your home insurance policy.  

Roof General: Roof Configuration
Gabled
Roof General: Homeowner’s Responsibility

The roof of your home is slowly deteriorating and aging. The sun, wind, rain and temperatures are constantly affecting it. Your job is to monitor the buildings exterior for its condition and weather-tightness. 

Check the condition of all roof materials and look for developing patterns of damage or deterioration. 

During a heavy rainstorm (without lightning), grab an umbrella and go outside. Walk around your house and look around at the roof and property. A rainstorm is the perfect time to see how the roof, downspouts and grading are performing. Observe the drainage patterns of your entire property, as well as the property of your neighbor. The ground around your house should slope away from all sides. Downspouts, surface gutters and drains should be directing water away from the foundation. 

Roof General: (P4) Inspected

The roof of the structure was visually inspected according to the standards of practice. 

Roof Covering: Roof-Covering Materials
Asphalt Shingles, Metal
Roof Covering: (P1) Layers Inspected

The roof had one layer of roof covering material installed at the time of inspection.

Roof Covering: (P4) Roof Covering Inspected

The roof covering was visually inspected from all safely accessible areas. Visual inspection includes proper installation and appearance of generally serviceable conditions at the time of the inspection. Any exceptions will be listed in this report.  This inspection is not a guarantee that a roof leak in the future will not happen. Even a roof that appears to be in good, functional condition will leak under certain circumstances. We will not take responsibility for a roof leak that happens in the future.  This is not a warranty or guarantee of the roof system.

Roof Structure: Inspected

All visible and safely accessible roof structural components were visually inspected for current condition at the time of the inspection. Exterior roof inspection typically includes examination of the visible roof framing including the ridge, rafters and sheathing, and walking over all safely accessible areas. 

Flashing: (P4) Inspected

Flashing is used to protect areas of the roof from moisture intrusion at the seems where two separate materials, objects, or wall-roof planes meet. The condition was visually inspected and checked for proper installation. Any notable deficiencies or limitations will be listed in this report.

Plumbing Vent Pipes: (P1) Inspected

All plumbing vents had serviceable rubber boot flange seals to protect areas of the roof from moisture intrusion. The vents appeared to be installed at a proper height and location and were in serviceable condition at the time of the inspection.

Flue Gas Vent Pipes: (P1) Inspected

The combustion appliance exhaust flue and flue flashing were visually inspected for proper installation and current condition at the time of the inspection. The flue gas vent pipe(s) should be in a serviceable condition. Any deficiencies or limitations will be listed in this report. 

Roof Drainage Systems: (P4) Inspected

The roof drainage system consisted of conventional gutters hung from the roof edges feeding downspouts, which route run-off away from the property’s foundation. The roof drainage system visually inspected for proper installation and current conditions. Gutters should be in serviceable condition. Determining if gutters leak at seams or spill water is generally difficult at the time of the inspection. Any notable deficiencies or limitations will be listed in this report.

2.2.1 – Roof Covering
EXPOSED NAILS
ROOF-MULTIPLE LOCATIONS

There appeared to be exposed nails in multiple areas of the roof that should be caulked/sealed. A qualified contractor should evaluate and repair or replace as necessary.

2.2.2 – Roof Covering
+ 4 more
WIND/FOOT/CONSTRUCTION DAMAGE
ROOF-MULTIPLE AREAS

The roof covering had minor damage wind, construction and/or foot traffic at multiple areas on the roof. A qualified contractor should evaluate and repair or replace as necessary.

 3 – Attic, Insulation and Ventilation
Attic Access: Attic Access Location
Laundry Room
Attic Access: (P4) Inspected

The attic had an access hatch that was visually inspected for proper installation, proper sizing, presence of insulation, and current condition. Any deficiencies or limitations will be listed in this report. 

Attic Structural Components: (P4) Inspected

The visible roof framing and structural components in the accessible areas of the attic were visually inspected for proper installation and serviceable condition at the time of inspection. Structural attic components should not be split, damaged, or rotted and should be properly fastened. Any notable differences will be listed in this report.

Attic Moisture Intrusion: Inspected

No visible signs of water intrusion were present at the time of the inspection.

Insulation in Attic: (P1) Type of Insulation
Fiberglass
Insulation in Attic: (P1) Depth of Insulation
Over 12 Inches

Determining how much insulation should be installed in a house depends upon where a home is located. The amount of insulation that should be installed at a particular area of a house is dependent upon which climate zone the house is located and the local building codes.  

Insulation in Attic: Inspected

Insulation levels are specified by R-Value. R-Value is a measure of insulation’s ability to resist heat traveling through it. The higher the R-Value the better the thermal performance of the insulation. Current standards for existing wood-framed buildings for this climate and location are R38-R60. Recommend increasing insulation to achieve current standards as necessary.

Ventilation in Attic: Attic Ventilation Type
Soffit, Turtle
Ventilation in Attic: (P2) Inspected

The ventilation in the attic appeared to be satisfactory. 

Exhaust System Vents: (P2) Visible Vents Inspected

Accessible, visible vent ducts were visually inspected for: proper termination to the exterior of the property, proper installation and support, and current conditions. Any notable deficiencies or limitations will be listed in this report. 

 4 – Exterior
General: Homeowner’s Responsibility

The exterior of your home is slowly deteriorating and aging. The sun, wind, rain and temperatures are constantly affecting it. Your job is to monitor the buildings exterior for its condition and weathertightness. 

Check the condition of all exterior materials and look for developing patterns of damage or deterioration. 

During a heavy rainstorm (without lightning), grab an umbrella and go outside. Walk around your house and look around at the roof and property. A rainstorm is the perfect time to see how the roof, downspouts and grading are performing. Observe the drainage patterns of your entire property, as well as the property of your neighbor. The ground around your house should slope away from all sides. Downspouts, surface gutters and drains should be directing water away from the foundation. 

General: (P4) Exterior Inspected

The exterior of the structure was inspected according to the standards of practice. 

Driveways: (P1) Inspected

The driveway was visually inspected for current conditions. The driveway should in generally serviceable condition. Due to expansive soils, minor cracks are to be expected. Any deficiencies will be listed in this report. Driveways and parking areas that were far away from the house foundation were not inspected.

Wall-Covering, Flashing & Trim: Type of Wall-Covering Material
Fiber Cement

The exterior of your home is slowly deteriorating and aging.  The sun, wind, rain and temperatures are constantly affecting it.  Your job is to monitor the house’s exterior for its condition and weather-tightness. 

Check the condition of all exterior wall-covering materials and look for developing patterns of damage or deterioration. 

Exterior Doors: Inspected

The exterior doors were visually inspected and operated to check for proper installation and current conditions. Any deficiencies or limitations will be listed in this report. Inspection of door exteriors typically includes the examination of the following: door exterior surface condition, weather-stripping condition, presence of an effective sweep, jamb condition, threshold condition, moisture-intrusion integrity, handle and lock hardware.

Windows: Inspected

A representative number of windows were visually inspected for proper installation and satisfactory condition at the time of inspection. Any deficiencies or limitations will be listed in this report. Inspection of window exteriors typically includes an examination of the visible and accessible exterior sash and sill condition, flashing above the window (presence and condition), steel lintels (where applicable), moisture-intrusion integrity.

Vegetation, Grading & Drainage: Inspected

The vegetation, grading & drainage, and retaining walls of the property were inspected – especially where they may adversely affect the structure due to moisture intrusion. Grading of the property appeared to route runoff from precipitation away from the foundation and appeared to be serviceable at the time of inspection.

Sprinkler System Supply Line: (P1) Inspected for Presence

Inspection of the lawn sprinkler system is beyond the scope of this home inspection. The inspector only noted components as to presence and not operation, design or configuration. There was an anti-siphon valve installed. The sprinkler system valves were not operated or activated.

Exterior Faucets (Hose Bibs): (P1) Inspected

The outside water faucet(s) were inspected and tested using a pressure gauge or cap. Faucets are checked for secure attachment and sealant on the siding. Knobs are visually inspected for presence and operated to test proper condition and test for leaks at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Sump Pump Discharge Pipe : (P1) Inspected

The sump pump discharge pipe was installed and had a proper extension that routed drainage away from the foundation. The discharge pipe appeared to be in serviceable condition.

Gas Meter, Gas Shut-Off: (P1) Location of Main Shut-Off Valve
Side of House

The condition and placement of the gas shut off and meter were visually inspected and checked for gas leaks. Any notable deficiencies or limitations will be listed in this report.

Exterior Foundation Wall: (P4) Visible Foundation Wall Inspected

The visible portions of the exterior foundation walls were visually inspected for current conditions. Due to expansive soils, and concrete setting conditions, minor cracks are to be expected. The majority of exterior foundation walls are not visible for inspection as the walls extend underground. Any notable deficiencies or limitations will be listed in this report.

Exterior Vents: Inspected

The exterior vents and vent covers were visually inspected for proper installation and current conditions. They should be secured to wall, not obstructed, and in generally serviceable condition. Any deficiencies or limitations will be listed in this report.

4.3.1 – Garage Door Exterior
DAMAGED – GLASS PANE
GARAGE DOOR

The exterior of garage door has a cracked/damaged glass pane. A qualified contractor should inspect and repair as necessary and according to current standards.

4.4.1 – Wall-Covering, Flashing & Trim
WORN/DAMAGED – SIDING
BACK RIGHT SIDE

The siding and/or trim was worn/damaged at the back right side of the exterior. A qualified contractor should evaluate and repair or replace as necessary.

4.5.1 – Eaves, Soffits & Fascia
EAVES-GAPS AT INTERSECTIONS
ABOVE THE SINGLE CAR GARAGE DOOR

The eaves had gaps at the edges between soffit panels or roof sheathing which allows insects and possible moisture to enter the property. A qualified contractor should evaluate and repair or replace as necessary.

4.5.2 – Eaves, Soffits & Fascia
EAVES- MISSING PAINT
MULTIPLE LOCATIONS

The eaves had areas of missing or mismatched paint at multiple locations around the property. A qualified contractor should evaluate and repair or replace as necessary.

4.7.1 – Electrical Fixtures
MISSING FIXTURES
GARAGE DOOR

The exterior light fixtures were missing at the sides of the garage door. A qualified contractor should evaluate and repair or replace as necessary.

4.7.2 – Electrical Fixtures
NOT WORKING – FIXTURE
GARAGE SIDE ENTRANCE

The exterior light fixture at the garage rear entrance was not working at the time of inspection. A qualified contractor should evaluate and repair or replace as necessary according to current standards.

4.8.1 – Electrical Outlets
MISSING – OUTLET
FRONT OF THE HOME

The exterior electrical outlet was missing at the front of the home. A qualified contractor should evaluate and repair or replace as necessary.

4.10.1 – Window Wells
WINDOW WELLS MISSING COVERS
EXTERIOR

Window Well(s) lacked covers and may represent a danger to small children and may trap pests. A qualified contractor should evaluate and repair or replace as necessary.

4.10.2 – Window Wells
WINDOW WELL DAMAGED
LEFT SIDE OF HOME

The window well at the left side of the home was bent/damaged. A qualified contractor should evaluate and repair or replace as necessary according to current standards.

4.11.1 – Walkways
CRACKING – MINOR
REAR PATIO

Minor cracking was visible on the walkway(s)/rear patio in areas. Monitoring is the minimum recommendation. A qualified contractor should evaluate and repair or replace as necessary and according to current standards.

4.11.2 – Walkways
IMPROPERLY SLOPED SURFACE
REAR PATIO

The rear patio have a negative slope and drains towards the home in areas. This condition is prone to water penetration into the home structure. A qualified contractor should evaluate and repair or replace as necessary and according to current standards.

4.21.1 – Roof Drainage – Downspouts & Extensions
MISSING – DOWNSPOUT/EXTENSION
RIGHT SIDE OF HOME

Downspouts/extensions were missing in areas at the right side of the home. This condition may cause problems by introducing excessive amounts of moisture to the soil beneath the foundation.  A qualified contractor should evaluate and repair or replace as necessary and according to current standards.

 5 – Attached Garage
Garage Description: (P4) Garage Description
Attached, 2 Car, 1 Car, Side of Home
Occupant Door: (P1) Inspected

The door was visually inspected for: general installation and condition, apparent signs of fire-resistive construction, and equipped with a self-closing or an automatic-closing device to protect against fire and toxic fumes. Any deficiencies or limitations will be listed in this report.

Visual signals of a fire-rated door: 

  • Presence of a fire-rated tag
  • A solid wood door at least 1-3/8 inches thick 
  • Solid or honeycomb-core steel door at least 1-3/8 inches thick
  • A tag stating a 20-minute fire-rated door.
Ceiling, Walls & Firewalls: Inspected

The ceiling and walls of the garage were inspected according to the Home Inspection Standards of Practice.

Floor: (P1) Visible Floor Inspected

The garage floor was visually inspected for current conditions. The garage floor should be in a generally serviceable condition. Due to expansive soils, minor cracks are to be expected in the slabs or control joints. Any deficiencies will be listed in this report. Some areas of the floor may have been visually obstructed.

Vehicle Door: Home Owners Responsibility

Garage doors have high-tension spring assemblies that you the home-owner need to be aware of. Garage doors should have warning labels present and legible to describe the potential hazards. 

The garage door spring assembly is built-in to assist in lifting the weight of the door. This assembly should be periodically looked over and tested by un-hooking the manual release and lifting the door to check for any difficulty or resistance – if there is any difficulty or resistance when lifting, it is recommended to have the door serviced by a garage door contractor. 

The main warning labels to look for are a general warning label on the door, and a spring warning label attached to either the spring assembly or the back of the door panel. 

Some newer doors have tamper-resistant bottom corner brackets that do not require all of these warning labels.

Vehicle Door: Door Description
Automatic, 2 Car, 1 Car
Vehicle Door: (P1) Inspected

Manual operation of the garage door was performed to inspect the current operation condition of the door. Any notable deficiencies or limitations will be listed in this report.

  • The manual safety release was pulled to disconnect the door from the opener assembly and the door was manually lifted to half and fully open positions to test the spring assembly’s performance. The door moved freely, and opened and closed without difficulty. The door was inspected as it moves to make sure the hinges are smooth, and rollers stay in the track. The safety release was reconnected, if present.
  • The garage door panels and framing brackets were inspected and found to be in satisfactory condition.
  • The springs, hinges, and supporting hardware were visually inspected for proper installation and current condition.
Electrical Outlets & Fixtures: (P1) Inspected

Garage electrical outlets were Ground Fault Circuit Interrupter (GFCI)-protected and responded to testing and appeared to be in a serviceable condition at the time of the inspection. 

GFCI protection is required for all 15- and 20-amp receptacles, including outlets for refrigerators, sprinkler systems, garage door openers, and washing machines – some items may not be protected on purpose due to the potential for them to go unnoticed and cause damage.

Stairs & Railings: Inspected

The stairs, steps, and ramps were inspected within the scope of a home inspection. 

All treads should be level and secure. Riser heights and tread depths should be as uniform as possible. As a guide, stairs must have a maximum riser of 7-3/4 inches and a minimum tread of 10 inches. 

5.2.1 – Occupant Door
GAP AROUND DOOR
GARAGE

Daylight or blank space was visible between door and frame/jamb at an exterior entry door in the garage. A qualified contractor should evaluate and repair or replace as necessary.

5.6.1 – Door Opener
+ 1 more
GARAGE DOORS-NOT OPERATIONAL – OPENER, BUTTON
GARAGE

The push-button opener on the wall needs to be held down to control the garage door openers and they need to be adjusted. A qualified contractor should evaluate and repair or replace as necessary.

5.6.2 – Door Opener
REVERSE SENSORS TOO HIGH
GARAGE

The photo-electric reverse sensors are installed too high from the garage floor surface. The vertical distance between the photo-eye beam and the floor should be no more than 6 inches. A qualified contractor should evaluate and repair or replace as necessary.

 6 – Interior, Doors, Windows
General: Home Owners Responsibility

Cracks – We may not comment on the cracks that appear around windows and doors, or which follow the lines of framing members and the seams of drywall and plasterboard. Some of these cracks would fall into a cosmetic defect category, and some cracks may be a consequence of movement, and will often reappear if they are not correctly repaired. Such cracks can become the subject of disputes, therefore a homeowner is responsible to have them evaluated by a specialist.

Air Quality – The homeowner should be aware there may be a number of environmental pollutants, which could include molds or other contaminants, the specific identification of which is beyond the scope of our service. Should you be concerned by anything in general, or by anything found during our inspection, a mold test or indoor air quality test is recommended. 

Hidden Issues – There are a host of lesser contaminants or defects that would likely not be discoverable to the naked eye even if you knew where to look. A home inspection is neither invasive nor exhaustive, we do not have permission to dismantle anything, and we do not have anything more to base an opinion on than current accessible and visual conditions. Hidden contaminants require additional environmental testing to discover -at the least.

Smells – There may be musty odors from past spills, odors from household pets, or odors from cigarette smoke that can permeate walls, carpets, heating and air conditioning ducts, and other porous surfaces, and which can be difficult to eradicate. However, inasmuch as the sense of smell adjusts rapidly, and the sensitivity to such odors is certainly not uniform, we recommend that you make this determination for yourself. If you or any member of your family suffers from allergies or asthma, it’s recommended that you schedule whatever testing and remedial services may be deemed necessary before the close of escrow.

General: (P#Areas) Common Areas Inspected

Our inspection of common living spaces includes the visually accessible areas of ceilings, walls, floors, cabinets, and closets, and includes the testing of a representative number of windows and doors, switches, and outlets. Nationally recognized home inspection standards require testing a minimum of one window, door, switch, and outlet in every room, where accessible. 

General: (P#Bedrooms) Bedrooms Inspected

Our inspection of bedrooms includes the visually accessible areas of ceilings, walls, floors, cabinets and closets, and includes the testing of a representative number of windows and doors, switches and outlets.

Floors: Inspected

The floors in the interior rooms were visually inspected for the current condition. The floors should appear to be in satisfactory condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report.

Doors: Inspected

Interior doors and hardware were lightly operated and visually inspected for proper installation and current conditions. They appeared to be in satisfactory condition at the time of inspection. Smooth door operation may change as the home heats and cools. Any deficiencies or limitations will be listed in this report. 

Windows: Inspected

The windows were visually inspected for proper installation and satisfactory condition at the time of inspection. Any deficiencies or limitations will be listed in this report. Windows are inspected for proper operation, condition of the sill, sash, hardware, and the condition of weather sealing components.  Windows in the home may have damaged thermal seals but they may not have been evident at the time of this inspection.  Dirt on the windows, the presence of screens, exterior, and interior lighting may make thermal seal damage difficult to see.  Evidence of damaged seals can appear and disappear as temperature and humidity change.  For a more thorough evaluation of window seals, the inspector recommends that the windows be professionally cleaned and reinspected by a professional window contractor.

Electrical Outlets: (P4) Inspected

A representative number of outlets were visually inspected and tested using an outlet tester. Outlets are checked for power, proper wiring (according to the testing tool,) installation, and placement. Any notable deficiencies or limitations will be listed in this report.

Electrical Fixtures & Switches: Inspected Light Fixtures & Switches

Light fixtures mounted in the interior rooms were tested for response to the switches or remotes and visually inspected for proper installation and current condition. Any notable deficiencies or limitations will be listed in this report.

Electrical Fixtures & Switches: (P#Fans) Ceiling Fans Inspected

Ceiling fans mounted in the interior rooms were visually inspected for proper installation and current condition. They were tested for response to switches or remotes and visually inspected during operation for wobbles, or noises. Any notable deficiencies or limitations will be listed in this report.   

Smoke & CO Detectors: (P1) Smoke Detector Inspected for Presence

The existing smoke detectors were tested, and responded to the test button, but they are only noted as to presence and operation as of date of inspection. Smoke detectors may work today but not work when you need them to work. This is why it is important for you to test them on a regular basis, monthly at least. Smoke detectors are recommended by the U.S. Product Safety Commission to be installed inside each bedroom and adjoining hallway and on each living level of the property and basement level.

Smoke & CO Detectors: (P1) CO Detector Inspected for Presence

Carbon monoxide detector(s) were provided in the property in appropriate locations within 15 feet from each sleeping area where they can wake occupants from sleeping. 

Additional detectors on every level and in every bedroom of a property provides extra protection. Property owners should remember not to install carbon monoxide detectors directly above or beside fuel-burning appliances, as appliances may emit a small amount of carbon monoxide upon start-up. A detector should not be placed within fifteen feet of heating or cooking appliances or in or near very humid areas such as bathrooms.

Installed Heat Source: (P#Sources) Presence of Heat Inspected

The heating system was turned on using normal operating controls.  As a courtesy to the client, the temperature was checked in all interior rooms that had a heat source installed (bathrooms, kitchens, laundry rooms, and unfinished spaces do not require heat sources).  The inspection of airflow and/or distribution is beyond the scope of the inspection.  We are not able to determine the supply adequacy of the heating system during the course of a general home inspection.

6.2.1 – Ceilings & Walls
DAMAGED – CEILINGS
FRONT LEFT BEDROOM

The ceilings showed signs of repair around the light fixture in the upstairs front left bedroom. A qualified contractor should evaluate and repair or replace as necessary.

6.8.1 – Stairways & Railings
LOOSE – HANDRAIL
STAIRWELL

At the interior stairs, the handrail was loose.  A fall or injury could occur if not corrected. A qualified contractor should evaluate and repair or replace as necessary. 

 7 – Bathroom
Bathroom Location: (P1) Bathroom Location
Master
Exhaust Fan: (P1) Inspected

The exhaust fan in the bathroom was visually inspected and operated using normal controls to examine the proper installation and current conditions. It should operate properly and be in a serviceable condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Ceilings & Walls: Inspected

The walls and ceilings in the bathroom was visually inspected for proper installation and current conditions. Any notable deficiencies or limitations will be listed in this report.

Floors: Inspected

The floors in the bathroom were visually inspected for the current condition. The floor should appear to be in satisfactory condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Windows: Inspected

The bathroom windows were visually inspected for proper installation and satisfactory condition at the time of inspection. Any deficiencies or limitations will be listed in this report. Windows are inspected for proper operation, condition of the sill, sash, hardware, and the condition of weather sealing components.  Windows in the home may have damaged thermal seals but they may not have been evident at the time of this inspection.  Dirt on the windows, the presence of screens, exterior, and interior lighting may make thermal seal damage difficult to see.  Evidence of damaged seals can appear and disappear as temperature and humidity changes.  For a more thorough evaluation of window seals, the inspector recommends that the windows be professionally cleaned and reinspected by a professional window contractor.

Electrical Outlets: (P1) Inspected

Bathroom electrical outlets were ground fault circuit interrupter (GFCI) protected, responded to testing, and appeared to be in a serviceable condition at the time of inspection.

Electrical Fixtures & Switches: Inspected

Light fixtures mounted in the interior rooms responded to the switches and appeared to be in a serviceable condition at the time of inspection.  

Cabinets & Counters: Inspected Cabinets

The cabinets/shelves in the bathroom were properly installed, secured with proper hardware, doors, and drawers (if present) were operational and in generally satisfactory condition.  

Cabinets & Counters: Inspected Counters

The countertops in this bathroom were properly installed, secured properly, and in generally satisfactory condition. 

Drain Waste and Vent System: (P2) Inspected

The visible drain, waste, and vent piping material in this bathroom were visually inspected for satisfactory condition and intended function. The drains from all functional fixtures were tested during the inspection for reasonable drainage time and overflow when other fixtures were drained simultaneously.

Any notable deficiencies or limitations will be listed in this report.

Water Supply Shutoff Valves: (P1) Inspected

The water shut off valves for the sink appeared to be in serviceable condition at the time of inspection. They were not operated but were visually inspected

Plumbing Fixtures: Inspected

The visible water supply piping in this bathroom was in satisfactory condition and was function as designed and intended. All functional plumbing fixtures were operated during the inspection and were secured properly, no signs of active leaks were present and were functioning as designed and intended. Evaluation of extra fixtures is outside the scope of the inspection. 

Toilets: (P1) Inspected

The visible components of the toilet were in satisfactory condition and functioning as designed and intended.  The toilet was secured properly to the floor, no visible evidence of leaking was present and the toilet emptied in a reasonable amount of time.

Tub, Shower Area: Inspected

The tub and/or shower areas were found to be correctly sealed and caulked at the time of inspection. Adjacent walls, windows, and floors were inspected and in a serviceable condition at the time of inspection.

Fixture Valve Installation And Temperature: (P2) Inspected

The hot and cold water supply valves and corresponding supply lines at the fixtures were installed correctly and were functioning as designed and intended. The hot control produced hot water,  and the cold control produced cold water. Hot and cold temperatures were within acceptable ranges according to current standards.

Water Supply Functional Flow: (P3 or Video) Inspected

The overall water pressure was good and had acceptable “functional Flow.”  This is determined by viewing the flow of shower water when another fixture is in use or when two fixtures are operated simultaneously.  

Installed Heat Source: (P1) Presence of Heat Inspected

The heating system was turned on using normal operating controls.  As a courtesy to the client, the temperature was checked in all interior rooms that had a heat source installed (bathrooms, kitchens, laundry rooms, and unfinished spaces do not require heat sources).  The inspection of airflow and/or distribution is beyond the scope of the inspection.  We are not able to determine the supply adequacy of the heating system during the course of a general home inspection.

7.2.1 – Doors
MISSING – HINGE PINS
MASTER BATHROOM

The door was missing pins from one or more hinges in the master bathroom. A qualified contractor should evaluate and repair or replace as necessary. 

 8 – Bathroom 2
Bathroom Location: (P1) Bathroom Location
Hallway
Doors: Inspected

Bathroom doors and hardware were lightly operated and visually inspected for proper installation and current conditions. They appeared to be in satisfactory condition at the time of inspection. Smooth door operation may change as the home heats and cools. Any deficiencies or limitations will be listed in this report. 

Exhaust Fan: (P1) Inspected

The exhaust fan in the bathroom was visually inspected and operated using normal controls to examine the proper installation and current conditions. It should operate properly and be in a serviceable condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Floors: Inspected

The floors in the bathroom were visually inspected for the current condition. The floor should appear to be in satisfactory condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Windows: Inspected

The bathroom windows were visually inspected for proper installation and satisfactory condition at the time of inspection. Any deficiencies or limitations will be listed in this report. Windows are inspected for proper operation, condition of the sill, sash, hardware, and the condition of weather sealing components.  Windows in the home may have damaged thermal seals but they may not have been evident at the time of this inspection.  Dirt on the windows, the presence of screens, exterior, and interior lighting may make thermal seal damage difficult to see.  Evidence of damaged seals can appear and disappear as temperature and humidity changes.  For a more thorough evaluation of window seals, the inspector recommends that the windows be professionally cleaned and reinspected by a professional window contractor.

Electrical Outlets: (P1) Inspected

Bathroom electrical outlets were ground fault circuit interrupter (GFCI) protected, responded to testing, and appeared to be in a serviceable condition at the time of inspection.

Electrical Fixtures & Switches: Inspected

Light fixtures mounted in the interior rooms responded to the switches and appeared to be in a serviceable condition at the time of inspection.  

Cabinets & Counters: Inspected Cabinets

The cabinets/shelves in the bathroom were properly installed, secured with proper hardware, doors, and drawers (if present) were operational and in generally satisfactory condition.  

Cabinets & Counters: Inspected Counters

The countertops in this bathroom were properly installed, secured properly, and in generally satisfactory condition. 

Drain Waste and Vent System: (P2) Inspected

The visible drain, waste, and vent piping material in this bathroom were visually inspected for satisfactory condition and intended function. The drains from all functional fixtures were tested during the inspection for reasonable drainage time and overflow when other fixtures were drained simultaneously.

Any notable deficiencies or limitations will be listed in this report.

Water Supply Shutoff Valves: (P1) Inspected

The water shut off valves for the sink appeared to be in serviceable condition at the time of inspection. They were not operated but were visually inspected

Plumbing Fixtures: Inspected

The visible water supply piping in this bathroom was in satisfactory condition and was function as designed and intended. All functional plumbing fixtures were operated during the inspection and were secured properly, no signs of active leaks were present and were functioning as designed and intended. Evaluation of extra fixtures is outside the scope of the inspection. 

Toilets: (P1) Inspected

The visible components of the toilet were in satisfactory condition and functioning as designed and intended.  The toilet was secured properly to the floor, no visible evidence of leaking was present and the toilet emptied in a reasonable amount of time.

Tub, Shower Area: Inspected

The tub and/or shower areas were found to be correctly sealed and caulked at the time of inspection. Adjacent walls, windows, and floors were inspected and in a serviceable condition at the time of inspection.

Water Supply Functional Flow: (P3 or Video) Inspected

The overall water pressure was good and had acceptable “functional Flow.”  This is determined by viewing the flow of shower water when another fixture is in use or when two fixtures are operated simultaneously.  

Installed Heat Source: (P1) Presence of Heat Inspected

The heating system was turned on using normal operating controls.  As a courtesy to the client, the temperature was checked in all interior rooms that had a heat source installed (bathrooms, kitchens, laundry rooms, and unfinished spaces do not require heat sources).  The inspection of airflow and/or distribution is beyond the scope of the inspection.  We are not able to determine the supply adequacy of the heating system during the course of a general home inspection.

8.4.1 – Ceilings & Walls
DAMAGED – WALLS
HALL BATHROOM

The walls showed signs of minor damage and punctures in the hall bathroom. A qualified contractor should evaluate and repair or replace as necessary.

8.15.1 – Fixture Valve Installation And Temperature
SHOWER REVERSED
UPSTAIRS HALL BATHROOM

The water supply valves and supply lines at the shower fixture in the hall bathroom were installed improperly with a reversed configuration. Current standards for installation produce hot water when the valve is turned to the left and cold water when the valve is turned to the right. A qualified contractor should evaluate and repair or replace as necessary.

 9 – Bathroom 3
Bathroom Location: (P1) Bathroom Location
1/2 Bath
Doors: Inspected

Bathroom doors and hardware were lightly operated and visually inspected for proper installation and current conditions. They appeared to be in satisfactory condition at the time of inspection. Smooth door operation may change as the home heats and cools. Any deficiencies or limitations will be listed in this report. 

Exhaust Fan: (P1) Inspected

The exhaust fan in the bathroom was visually inspected and operated using normal controls to examine the proper installation and current conditions. It should operate properly and be in a serviceable condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Ceilings & Walls: Inspected

The walls and ceilings in the bathroom was visually inspected for proper installation and current conditions. Any notable deficiencies or limitations will be listed in this report.

Floors: Inspected

The floors in the bathroom were visually inspected for the current condition. The floor should appear to be in satisfactory condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Electrical Outlets: (P1) Inspected

Bathroom electrical outlets were ground fault circuit interrupter (GFCI) protected, responded to testing, and appeared to be in a serviceable condition at the time of inspection.

Electrical Fixtures & Switches: Inspected

Light fixtures mounted in the interior rooms responded to the switches and appeared to be in a serviceable condition at the time of inspection.  

Cabinets & Counters: Inspected Cabinets

The cabinets/shelves in the bathroom were properly installed, secured with proper hardware, doors, and drawers (if present) were operational and in generally satisfactory condition.  

Cabinets & Counters: Inspected Counters

The countertops in this bathroom were properly installed, secured properly, and in generally satisfactory condition. 

Drain Waste and Vent System: (P2) Inspected

The visible drain, waste, and vent piping material in this bathroom were visually inspected for satisfactory condition and intended function. The drains from all functional fixtures were tested during the inspection for reasonable drainage time and overflow when other fixtures were drained simultaneously.

Any notable deficiencies or limitations will be listed in this report.

Water Supply Shutoff Valves: (P1) Inspected

The water shut off valves for the sink appeared to be in serviceable condition at the time of inspection. They were not operated but were visually inspected

Plumbing Fixtures: Inspected

The visible water supply piping in this bathroom was in satisfactory condition and was function as designed and intended. All functional plumbing fixtures were operated during the inspection and were secured properly, no signs of active leaks were present and were functioning as designed and intended. Evaluation of extra fixtures is outside the scope of the inspection. 

Toilets: (P1) Inspected

The visible components of the toilet were in satisfactory condition and functioning as designed and intended.  The toilet was secured properly to the floor, no visible evidence of leaking was present and the toilet emptied in a reasonable amount of time.

Fixture Valve Installation And Temperature: (P2) Inspected

The hot and cold water supply valves and corresponding supply lines at the fixtures were installed correctly and were functioning as designed and intended. The hot control produced hot water,  and the cold control produced cold water. Hot and cold temperatures were within acceptable ranges according to current standards.

Water Supply Functional Flow: (P3 or Video) Inspected

The overall water pressure was good and had acceptable “functional Flow.”  This is determined by viewing the flow of shower water when another fixture is in use or when two fixtures are operated simultaneously.  

Installed Heat Source: (P1) Presence of Heat Inspected

The heating system was turned on using normal operating controls.  As a courtesy to the client, the temperature was checked in all interior rooms that had a heat source installed (bathrooms, kitchens, laundry rooms, and unfinished spaces do not require heat sources).  The inspection of airflow and/or distribution is beyond the scope of the inspection.  We are not able to determine the supply adequacy of the heating system during the course of a general home inspection.

9.6.1 – Windows
WINDOW-SEALANT DAMAGED AROUND FRAME
1/2 BATHROOM

Sealant was missing in areas around the window in the 1/2 bathroom. A qualified contractor should evaluate and repair or replace as necessary.

 10 – Kitchen
Kitchen General: (P1) Kitchen & Appliances Description
Oven, Dishwasher, Microwave, Refrigerator, Cooktop

The kitchen was inspected according to the set standards of practice for home inspectors. A limited inspection was done on the installed appliances. The inspection of appliances is outside the scope of a general home inspection. If the client would like a more intensive inspection of any appliances they should contact a qualified contractor to further evaluate before accepting any agreements.

Doors: Inspected

Kitchen doors and hardware were lightly operated and visually inspected for proper installation and current conditions. They appeared to be in satisfactory condition at the time of inspection. Smooth door operation may change as the home heats and cools. Any deficiencies or limitations will be listed in this report. 

Ceilings & Walls: Inspected

The walls and ceilings in the kitchen were visually inspected for proper installation and current conditions. Any notable deficiencies or limitations will be listed in this report.

Windows: Inspected

The kichen windows were visually inspected for proper installation and satisfactory condition at the time of inspection. Any deficiencies or limitations will be listed in this report. Windows are inspected for proper operation, condition of the sill, sash, hardware, and the condition of weather sealing components.  Windows in the home may have damaged thermal seals but they may not have been evident at the time of this inspection.  Dirt on the windows, the presence of screens, exterior, and interior lighting may make thermal seal damage difficult to see.  Evidence of damaged seals can appear and disappear as temperature and humidity changes.  For a more thorough evaluation of window seals, the inspector recommends that the windows be professionally cleaned and reinspected by a professional window contractor.

Floors: Inspected

The floors in the kitchen were visually inspected for the current condition. The floor should appear to be in satisfactory condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Cabinets & Counters: Inspected Cabinets

The cabinets/shelves in the kitchen were properly installed, secured with proper hardware, doors and drawers (if present) were operational and in generally satisfactory condition.  

Cabinets & Counters: Inspected Counters

The counter tops in the kitchen were properly installed, secured properly and in generally satisfactory condition. 

Electrical Outlets: (P1) Inspected

Kitchen electrical outlets were ground fault circuit interrupter (GFCI) protected, responded to testing and appeared to be in serviceable condition at the time of inspection.

Faucets Fixtures: Inspected

The visible water supply piping in the kitchen was in satisfactory condition and was function as designed and intended. All functional plumbing fixtures were operated during the inspection and were secured properly, no signs of active leaks were present, and were functioning as designed and intended. Evaluation of extra fixtures is outside the scope of the inspection. 

Drain Waste and Vent System: (P2) Inspected

The visible drain, waste, and vent piping material in the kitchen were visually inspected for proper installation and for satisfactory current condition. The drains from all functional fixtures were tested during the inspection to verify that they emptied in a reasonable amount of time and did not overflow when other fixtures were drained simultaneously. Any deficiencies or limitations will be listed in this report.

Water Supply Shutoff Valves: (P1) Inspected

The water shut off valves for the sink appeared to be in serviceable condition at the time of inspection. They were not operated but were visually inspected

Food Waste Disposer: Brand
Moen
Food Waste Disposer: (P2) Inspected

The food waste disposer was operational, securely installed, electrical wiring was properly secured with Romex connector and the drain lines were installed properly with no leaks at the time of inspection

Dishwasher: Brand
Whirlpool
Dishwasher: (P4) Inspected

The dishwasher was operated and checked for leaks at the time of inspection. Inspection of appliances, such as the dishwasher, is outside the scope of a general home inspection. However, as a courtesy to the client, we will operate the dishwasher to confirm that it is working and there are no leaks during the time of inspection. This operation of the dishwasher does not serve as a certification that the dishwasher is properly installed up to current standards, but is meant to give the client additional information that the dishwasher operated and no leaks were visible at the time of inspection. It is common for appliances to fail over time and the dishwasher should be monitored as needed to ensure proper operation in the future.  If the client would like a more intensive inspection of the dishwasher or any other appliance they should contact a qualified contractor to further evaluate before the inspection objection deadline.

Range/Oven/Cooktop: Fuel Source
Gas Cooktop, Gas Oven
Range/Oven/Cooktop: Brand
Whirlpool
Range/Oven/Cooktop: (P4) Inspected

All accessible cooking elements and burners were tested for proper operation at the time of inspection. Any notable exceptions will also be listed in this report.

The inspection of the range/oven/cooktop is non-exhaustive and limited by nature. This inspection is not an approval or a guarantee that the range/oven/cooktop will last, only a representation of the conditions on the day of the inspection. The range/oven/cooktop are all appliances that typically stop working well or stops working altogether in a sudden instance. If the client would like a more intensive inspection of the range/oven/cooktop or any other appliance they should contact a qualified contractor to further evaluate before accepting any agreements.

Range Hood: Exhaust Vent Type
Recirculating Range Hood Fan, Combination Microwave/Range Hood Fan
Range Hood: (P1) Inspected

The range hood fan was tested and was operational at the time of inspection. The device was visually inspected for an operational light and general cleanliness from excessive grease build-up. Any deficiencies or limitations will be listed in this report.

Mounted Microwave: Brand
Whirlpool
Mounted Microwave: (P2) Inspected

The permanently installed microwave was properly secured, tested, and was operable at the time of inspection. This inspection is not an approval or a guarantee that the microwave will last, only a representation of the conditions on the day of the inspection. A microwave is an appliance that typically stops working well or stops working altogether in a sudden instance. If the client would like a more intensive inspection of the microwave or any other appliance they should contact a qualified contractor to further evaluate before accepting any agreements.

Refrigerator: Brand
Whirlpool
Refrigerator: (P3) Inspected

The refrigerator and freezer were visually inspected and checked for optimal cooling and freezing temperatures. Water fixtures are tested if present. Any deficiencies or limitations will be listed in this report. The inspection of the refrigerator is non-exhaustive and limited by nature. This inspection is not an approval or a guarantee that the refrigerator will last, only a representation of the conditions on the day of the inspection. A refrigerator is an appliance that typically stops working well or stops working altogether in a sudden instance. If the client would like a more intensive inspection of the refrigerator or any other appliance they should contact a qualified contractor to further evaluate before accepting any agreements.

Installed Heat Source: (P1) Presence of Heat Inspected

The heating system was turned on using normal operating controls.  As a courtesy to the client, the temperature was checked in all interior rooms that had a heat source installed (bathrooms, kitchens, laundry rooms, and unfinished spaces do not require heat sources).  The inspection of airflow and/or distribution is beyond the scope of the inspection.  We are not able to determine the supply adequacy of the heating system during the course of a general home inspection.

10.8.1 – Electrical Fixtures & Switches
NOT WORKING – BULB
KITCHEN

A fixture or bulb was not responding to switches at the time of inspection in the kitchen. A qualified contractor should evaluate and repair or replace as necessary.

 11 – Laundry
Laundry Room Location: (P1) Laundry Area Location
2nd Floor, Hallway Closet
Doors: Inspected

Laundry doors and hardware were lightly operated and visually inspected for proper installation and current conditions. They appeared to be in satisfactory condition at the time of inspection. Smooth door operation may change as the home heats and cools. Any deficiencies or limitations will be listed in this report. 

Exhaust Fan: (P1) Inspected

The laundry exhaust fan operated properly and appeared to be in serviceable condition at the time of inspection. 

Exhaust Fan: (P1) Passive Vent

The laundry area had a passive vent in place for ventilation purposes. Normally an exhaust fan or an openable window is needed for proper ventilation, and in some designs, a passive vent will achieve the necessary air flow. 

Ceilings & Walls: Inspected

The walls and ceilings in the laundry were visually inspected for proper installation and current conditions. Any notable deficiencies or limitations will be listed in this report.

Floors: Inspected

The floors in the laundry area were visually inspected for the current condition. The floor should appear to be in satisfactory condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Electrical Outlets: (P1) Inspected

Laundry electrical outlets were ground fault circuit interrupter (GFCI) protected, responded to testing and appeared to be in serviceable condition at the time of inspection.

220 Volt Dryer Outlet: Dryer Outlet Type
4-pronged
220 Volt Dryer Outlet: (P1) Inspected

The 220-volt dryer electrical outlet was inspected and appeared to be in serviceable condition at the time of inspection.

Dryer Vent Piping: Vent Material
Metel
Dryer Vent Piping: (P1) Inspected

A dyer vent connection was installed in the laundry area. The dryer vent connection was examined visually only. A visual examination will not detect the presence of lint accumulated inside the vent, which is a potential fire hazard. We recommend that you have the dryer vent cleaned at the time of purchase and annually in the future to help ensure that safe conditions exist. Lint accumulation can occur even in approved, properly installed vents.

 12 – Electrical
Electric Meter & Base: (P1) Inspected

The meter was installed at a proper height, with the center of the meter measuring between 4 feet and  6 feet above the walking surface. The electric meter was securely fastened to the property and appeared to be in serviceable condition at the time of the inspection.

Distribution Panels: (P1) Main Panel Inspected

The electrical distribution panel installation and condition was inspected, and found to be in satisfactory condition at the time of inspection.

Distribution Panels: (P1) Manufacture Label

The manufacturer’s label was present at the main electrical service panel. The manufacturer’s label typically provides information describing the main panel such as the name of the panel manufacturer, the panel model number, the panel amperage rating, limitations related to the environment in which the panel was designed to be installed, and grounding/bonding information for that particular model.

Distribution Panels: (P1) Circuit Breaker Labels

Circuits in the main service panel were labeled for the main electrical service panel. Determining the accuracy of the labeling is beyond the scope of a standard residential home inspection and was not verified. When the opportunity arises, we recommend verifying the accuracy of the labeling by actually operating the breakers.

Main Service Shut-Off: Main Disconnect Rating
150 Amps
Main Service Shut-Off: (P1) Inspected for Presence

The main electrical disconnect was provided by a two-pole circuit breaker mounted in the main distribution panel. The breaker appeared to be in good condition, although it was not tested during this inspection.

Service-Entrance Conductors: (P1) Inspected

Electrical service-entrance conductors were inspected and found to be in satisfactory condition at the time of inspection.

Electrical Circuit Breakers: (P1) Inspected

Electrical over-current protection devices (circuit breakers and fuses) were not tested but visually inspected, for satisfactory installation and condition at the time of inspection. Any notable deficiencies or limitations will be listed in this report. 

Electrical Wiring: (P2) Type of Wiring
Copper Solid, Stranded Aluminum
 13 – Plumbing
Main Water Shut-Off Valve: (P1) Location
Basement Middle
Main Water Shut-Off Valve: (P1) Shut-Off Description
White, Lever
Main Water Shut-Off Valve: Inspected

The plumbing supply system had a shutoff valve installed. It appeared to be in serviceable condition but testing the operation of this valve is not within the scope of a property inspection.  

The valve was not operated during the inspection; however, it should be “exercised” periodically to maximize its useful life so that it will remain functional when the need arises.

Water pipe fittings connected to the adjacent pipes appeared to be in a serviceable condition at the time of the inspection.

Water Supply : Main Water Supply Line Material
Copper
Water Supply : (P1) Inspected

The main water supply line material is considered what enters the home from the city or well. The water supply to the house appeared to be in satisfactory condition at the time of the inspection. Any deficiencies or limitations will be listed in this report.

It is recommended to ask the homeowner for details regarding the water source. 

It is recommended to have water potability testing done if there is any question about drinking tap water.

Water Supply & Distribution Systems: Water Supply Distribution Material
PEX
Water Supply & Distribution Systems: (P1) Inspected

The exposed, visible, distribution piping running from the main source to each faucet or fixture was inspected. 

The exposed and visible supply piping was in acceptable condition.  

Water Pressure: Water Pressure
Low Pressure
Drain, Waste, & Vent Systems: Drain, Waste, & Vent Materials
PVC
Drain, Waste, & Vent Systems: (P1) Inspected

The drain system appears to be in satisfactory condition at the time of inspection. The drain system should have at least one accessible cleanout for regular maintenance on the main drain vent/pipeline. Pipes should have a proper slope and be securely installed. The drainage from all functioning plumbing fixtures was tested during the inspection to search for visible leaks in the accessible main drain line. Any notable deficiencies or limitations will be listed in this report.

Gas Piping: Inspected

The interior gas piping was visually inspected for acceptable conditions and tested for leaks at accessible areas. Gas piping should not be corroded or have evidence of leakage at any of the exposed gas piping. Not all areas are accessible due to installation location behind walls or on high ceilings. Pressure testing is considered beyond the scope of a property inspection.

Sump Pit: (P1) Location
Basement Floor
Sump Pit: (P1) Sump Pump Inspected

The property had a sump pump installed. The sump pump had an external float, was tested and responded to the controls. This system protects the property from water intrusion by discharging rising groundwater or seepage from surface runoff to the exterior of the property or to a waste pipe or storm drain. Sump pumps require periodic maintenance to ensure that they work when they’re needed and should be tested on an annual basis to ensure they are in working order. The pumps can be tested by lifting the float, but to avoid potential shock/electrocution hazard testing should be performed using a tool which will not conduct electricity. Pumps have a filter that should be cleaned during routine maintenance.

13.4.1 – Water Pressure
LOW WATER PRESSURE
PLUMBING

The property water supply pressure was measured at the exterior faucet or laundry hose bib. Property water supply pressure was lower than the 40 pounds per square inch (PSI), which is considered inadequate by generally-accepted current standards. A qualified contractor should evaluate and repair or replace as necessary.

 14 – Water Heating Equipment
General Information: (P1) Type of Water Heater
Gas Tank
General Information: (P1) Label Information
50 Gal
General Information: Water Heating Equipment Age
New

The water heater age was determined by the photo included in this report. According to the U.S. Department of energy, these major appliances are intended to run for between 8 and 12 years. Be advised that every water heater will age differently relative to the following life span factors: water quality, mineral buildup, frequency of flushing, the volume of water utilized, size of the tank, brand, and quality of water heater. Although it was operating at the time of the inspection, the inspector can not determine the remaining life of the water heater.

 

The lifespan of water heaters depends on the following: 

-The quality of the water heater 

-The chemical composition of the water 

-The long term water temperature settings 

-The quality and frequency of past and future maintenance

 

Flushing the water heater tank once a year and replacing the anode rod every 4 years will help extend its lifespan. You should keep the water temperature set at a minimum of 120 degrees Fahrenheit to kill microbes and a maximum of 130 degrees to prevent scalding

Water Shut-Off: Shut-Off Description
White, Lever
Water Shut-Off: (P1) Inspected

The water heating equipment had a cold water supply shutoff valve installed. The valve was not operated during the inspection; however, it should be “exercised” periodically so that it will remain functional when the need arises.

Water pipe fittings connected to the water heating equipment were visually inspected for the serviceable condition at the time of inspection. Any deficiencies or limitations will be listed in this report.

Pipe Connections: (P1) Inspected

Water pipe fittings connected to the water heating equipment were visually inspected for the current condition at the time of inspection. Any deficiencies or limitations will be listed in this report.

Expansion Tank / Valve: (P1) Inspected

The heating system had an expansion tank/valve installed to allow for thermal expansion of water in the plumbing pipes. The expansion tank appeared to be properly installed and in serviceable condition. We do not dismantle, drain or inspect the inside of the tank.

Draft Diverter & Exhaust Flue: (P1) Inspected

The draft diverter of the gas-fired water heater had proper clearance to allow for proper uptake of cool air, was properly aligned and secured. Water heater venting systems are designed to moderate vent temperatures and control exhaust velocity by mixing room-temperature air with hot exhaust gasses.

 

The gas-fired water heater exhaust flue connected to the furnace flue pipe with the proper double wall Y connection or had its own separate flue. The exhaust vent had proper clearance from combustibles.

Combustion Air Supply: (P1) Inspected

The combustion air supply for this appliance was present. 

The fresh air supply is recommended by manufacturers for the efficient operation of fuel-burning appliances. Years ago, the air could come from inside or outside the building, however, more recent standards prefer combustion air to come from the outside only. 

Gas Supply Shut-Off Valve: (P1) Inspected

The gas supply piping included a shutoff valve in the vicinity of the heater for service personnel and emergency use. No evidence of leakage was detected at any of the exposed gas piping. The valve was not operated as part of the inspection.

Temperature & Pressure Relief Valve: (P2) Inspected

The water heater was equipped with a TPR (Temperature Pressure Relief) valve and a properly-configured TPR valve discharge pipe which was properly connected to the T&P relief valve and terminated within 6″ from the floor. This device is an important safety feature and should not be altered or tampered with, and was not tested as part of the inspection. No adverse conditions were observed.

Drain Valve & Drip Pan: Inspected Drain Valve

There was a drain valve which was in serviceable condition at the time of inspection.

 

 

Drain Valve & Drip Pan: Inspected Drip Pan

The water heater was equipped with a drip pan which had an overflow pipe routed to a proper discharge.

Burn Chamber: (P1) FVIR Sealed

The water heater was “F.V.I.R.” (Flammable Vapor Ignition Resistant) compliant and had a sealed burn chamber that was not visible for inspection. Any notable deficiencies will be listed in this report.

Operation & Response to Controls: (P3) Gas Operation & Controls Inspected

The gas water heater had either a glow plug or an electronic spark ignition that automatically ignites when demand for hot water is called for by the thermostat. The thermostat is a dial with general temperature settings such as warm, hot, and very hot.

The water heater responded to the demand for hot water. The ignition system was in acceptable condition.

Water Temperature: Water Temperature
131-140 Degrees
14.9.1 – Exterior Condition/Leakage
NOT SUPPORTED/LEVEL
WATER HEATER

The water heating equipment was not properly supported/level. A qualified contractor should evaluate and repair or replace as necessary.

14.11.1 – Burn Chamber
MISSING COVER
WATER HEATER

The burn chamber cover was missing. A qualified contractor should evaluate and repair or replace as necessary.

14.13.1 – Water Temperature
WATER TEMPERATURE HIGH
WATER HEATER

The water temperature was higher than the acceptable range of 120-130 degrees. We recommend adjusting the water heater thermostat. A qualified contractor should evaluate and repair or replace as necessary.

 15 – Heating
Heating System Information: Homeowner’s Responsibility

Most HVAC (heating, ventilating and air-conditioning) systems in houses are relatively simple in design and operation. They consist of four components: controls, fuel supply, heating or cooling unit, and distribution system. The adequacy of heating and cooling is often quite subjective and depends upon occupant perceptions that are affected by the distribution of air, the location of return-air vents, air velocity, the sound of the system in operation, and similar characteristics. 

It’s your job to get the HVAC system inspected and serviced every year. And if you’re system has an air filter, be sure to keep that filter cleaned. 

Heating System Information: Location
Basement
Heating System Information: Energy Source
Gas
Heating System Information: Heating Method
Forced-Air Furnace
Heating System Information: (P1) Efficiency
High Efficiency

AFUE – Annual Fuel Utilization Efficiency

AFUE measures a gas furnace’s efficiency in converting fuel to energy. For example, a furnace that has an 80 percent AFUE rating can turn 80 percent of the energy it consumes into heat. The other 20 percent is lost during the heating process. Efficiency relates to cost of use, with low efficiency costing the most.

Heating System Information: (P1) Heating Equipment Age
New

Information from the heating system data plate is shown in the photo and contains the manufacturer, serial number, size, and date. 

In most cases, furnaces last between 15 to 20 years but many are in service for over 40 years. Furnace life expectancy, like any other product, will vary greatly for a number of reasons. Installation quality and proper sizing, personal comfort preferences and thermostat settings, climate, quality of your heating fuel source, and regular furnace maintenance all can play a role in either extending… or reducing furnace lifespan. Without putting an actual number on it, your furnace can last as long as you continue to keep up with routine, annual maintenance, and minor repairs. And when a major issue presents itself, the decision to repair or replace your furnace with a new one will go a long way towards determining the actual lifespan of your current model.

Opinions about furnace life expectancy will vary from individual to individual. Much like your car, it’s not uncommon for an older furnace to need some basic repairs. One homeowner might want a new model the first time a minor repair is needed and the furnace is out of warranty. Another might be willing to make a number of repairs before deciding the old furnace is finished. Others might even be willing to replace major components like a heat exchanger or blower motor. But basing your expectation on a furnace’s warranty might be a good place to start.

Exhaust Flue: (P1) Inspected

The gas-fired heating system exhaust flue was visually inspected for proper installation and current condition. The exhaust flue should be in a serviceable condition with proper connections, slope, and clearance from combustibles.

Combustion Air Supply: (P1) Inspected

The combustion air supply for this appliance was present. 

The fresh air supply is recommended by manufacturers for the efficient operation of fuel-burning appliances. Years ago, the air could come from inside or outside the building, however, more recent standards prefer combustion air to come from the outside only. 

Shut-Off Switch: (P1) Inspected

The service disconnect was within sight of the heating system. Although it was not operated, it appeared to be in a serviceable condition at the time of the inspection.

Gas Supply Shut-Off Valve: (P1) Inspected

The gas supply piping included a shutoff valve in the vicinity of the heating system for service personnel and emergency use. The shutoff valve was checked for evidence of gas leakage at any of the exposed gas piping. Any deficiencies or limitations will be listed in this report. The valve was not operated as part of the inspection.

Cabinet : (P1) Inspected

The furnace cabinet exterior and interior appeared to be in a serviceable condition at the time of the inspection.

Condensate: (P1) Inspected

The heating/cooling system had a condensation discharge pipe connected to a drain or condensate pump installed at the heating system. This pipe was visually inspected for the current condition and proper routing to an acceptable discharge location. Any notable deficiencies or limitations will be listed in this report. 

Ductwork: Inspected Visible Ductwork

There was HVAC ductwork installed on the property.  Warm-air heating systems, including heat pump systems, use ductwork to distribute the warm air throughout the house.  The inspector will attempt to determine if each room has a heat source, but may not be able to access every duct register.  Most of the ductwork is concealed within the walls and floor systems of the property and cannot be fully evaluated for proper installation or configuration.

Air Filter: Location
Under Blower
Air Filter: (P1) Inspected

The HVAC system was equipped with an air filter. The air filter is visually inspected to check that it is clean and properly secured into position. Any deficiencies or limitations will be listed in this report. 

Blower: (P1) Inspected

The heating system blower was visually inspected for satisfactory operating conditions at the time of the inspection. Any deficiencies or limitations will be listed in this report. Preventative maintenance would include changing air filters at recommended intervals. Blowers are subjected to high dirt, dust, and lint conditions and should be cleaned upon moving in and regularly throughout usage.

Thermostat & Normal Operating Controls: (P2) Thermostat Location
Hallway

The thermostat(s) was installed at a location in the property, which appears to be adequate to operate the HVAC system efficiently. The thermostat(s) was fastened securely to the wall, activated the HVAC unit, and appeared to be in serviceable condition. The inspector takes two pictures of the thermostat. The first picture is to show all of the settings on the thermostat before the inspector operates it and the second picture shows that the inspector has reset the thermostat back to the original settings after the operation.

Heating System Ignition & Operation: (P1) Glow Plug Ignition

A mid or high-efficiency furnace uses a glow plug for an ignition source for the gas furnace burners. The glow plug appeared to be in satisfactory condition at the time of inspection.

Heating System Ignition & Operation: (P1) Heating System Operation

The heating operation and furnace burners were visually inspected and appear to be operational at the time of the inspection. A furnace burner is a component of a furnace where the air mixes with fuel and is burned in order to create heat.

 16 – Cooling
Cooling System Information: (P1) Split System

The air conditioning system was a split system in which the cabinet housing the compressor, cooling fan, and condensing coils was located physically apart from the evaporator coils. As is typical with split systems, the compressor/condenser cabinet was located at the property’s exterior so that the heat collected inside the property could be released to the outside air. Evaporator coils designed to collect heat from the property interior were located inside a duct at the furnace.

Cooling System Information: (P1) Label Information

Information from the air-conditioner data plate is shown in the photo and contains the manufacturer, serial number, size, and date of manufacture.

Cooling System Information: Equipment Age
New
AC Refrigerant Lines: (P1) Inspected

The visible air-conditioner refrigerant lines did not show any visible signs of damage.

AC Compressor: (P1) Inspected

The air-conditioner compressor exterior cabinet appeared to be in serviceable condition at the time of the inspection.

Thermostat & Normal Operating Controls: (P2) Thermostat Location
Hallway

The thermostat(s) was installed at a location in the property, which appears to be adequate to operate the HVAC system efficiently. The thermostat(s) was fastened securely to the wall, activated the HVAC unit, and appeared to be in serviceable condition. The inspector takes two pictures of the thermostat. The first picture is to show all of the settings on the thermostat before the inspector operates it and the second picture shows that the inspector has reset the thermostat back to the original settings after the operation.

16.4.1 – AC Service Disconnect
SERVICE DISCONNECT NOT PRESENT
AC

The electrical service disconnect and whip for the air conditioning condenser was not installed at the time of inspection. No power to the AC was present at the time of inspection. A qualified contractor should evaluate and repair or replace as necessary.

 17 – Structural Basement
General Information: Homeowner’s Responsibility

One of the most common problems in a house is a wet basement or foundation. You should monitor the walls and floors for signs of water penetration, such as dampness, water stains, peeling paint, efflorescence, and rust on exposed metal parts. In a finished basement, look for rotted or warped wood paneling and doors, loose floor tiles, and mildew stains. It may come through the walls or cracks in the floor, or from backed-up floor drains, leaky plumbing lines, or a clogged air-conditioner condensate line. 

General Information: Basement Configuration
Full Basement Unfinished
General Information: (P2) Inspected

The basement was inspected according to the Home Inspection Standards of Practice

The basement can be a revealing area in the house and often provides a general picture of how the entire structure works. In most basements, the structure is exposed overhead, as are the HVAC distribution system, plumbing supply and DWV lines, and the electrical branch-circuit wiring. I inspected those systems and components.

Basement Floor: (P2) Inspected
Concrete Slab

The basement floor was visually inspected for current conditions. The basement floor should in generally serviceable condition. Due to expansive soils, minor cracks are to be expected in the slabs or control joints. Any deficiencies will be listed in this report. Some areas of the floor may have been visually obstructed.

Basement Interior Wall Structure: (P1) Floating Walls Present

Visible basement walls were constructed using a method which will allow for soil movement. This method is usually termed “floating” the walls and involves leaving a gap at the bottom of the wall so that vertical movement (heaving) of the concrete slab basement floor will not be transmitted to the rest of the property structure. Colorado has areas with expansive soils. Expansive soils are soils which increase to many times their original volume in response to increases in soil moisture content, creating forces which can easily damage property structural components such as foundations, floor slabs, flat work and interior and exterior wall coverings.

Moisture Intrusion: (P2) Inspected

The structural basement was visually inspected and checked using a moisture meter reading tool. Any moisture readings taken should be below or within the acceptable range at the time of inspection and there should not be visible signs of water intrusion present at the time of inspection. Any deficiencies or limitations will be listed in this report. 

Floor Structure & Supports: (P1) Floor Structure Inspected

The visible floor structure in the basement appeared to be in generally serviceable condition at the time of the inspection. Notable exceptions will be listed in this report. 

A raised floor structure is constructed with a wooden framework that bridges from one exterior wall to another. This framework may or may not be supported intermediately by pier and post, girders, beams, or walls.

Inspection of the floor structure typically includes examination of the condition and proper installation of the following: Joist condition, Joists supporting structures and members, Connections and fasteners, Floor sheathing.

Floor Structure & Supports: (P1) Structural Supports Inspected

The visible floor structural supports in the basement appeared to be in generally serviceable condition at the time of the inspection. Notable exceptions will be listed in this report. 

Structural supports are typically provided by a pier/post and beam system. Any wood used for support posts should be pressure treated and not sit on dirt floors, but instead be on concrete pads with footings that spread the load. Beams (aka girders) are typically iron or pressure treated lumber and should be level and squarely installed on top of wooden posts, masonry piers, or concrete piers.

Insulation: (P1) Inspected

The walls and/or the floor system of the basement were insulated with fiberglass batt. Insulation appeared to be installed in a satisfactory manner.

Vapor Barriers: (P1) Inspected

The vapor barriers of the basement appeared to be in acceptable condition at time of inspection.

Electrical in Basement: Inspected

All visible electrical components in the basement were in serviceable condition at time of inspection.

Plumbing in Basement: Inspected

The visible accessible plumbing in the basement appeared to be in serviceable condition at time of inspection.

 18 – Mold Inspection
A Word About Mold and Other Toxins

As stated in the Inspection Agreement, and acknowledged by the Client, the parties agree that all buildings contain some amount of mold and that the inspector is held harmless from any claim arising from the presence of any level or species of mold, which may exist in, or on, the structure or property either at the time of the inspection or identified or discovered anytime thereafter. Mold can occur at any time, and for a variety of reasons, including water penetration or elevated moisture content. It may also remain hidden from view, or return at any time after cleaning if the root cause for the mold growth was not identified and corrected. As the inspection is visual only, and therefore noninvasive, it is virtually impossible for an inspector to identify all conditions which could result in mold growth, and is also impossible for an inspector to reasonably identify an area of mold growth. The Client further acknowledged and agreed that the inspector is not responsible for the discovery of toxins of any type, either inside or outside the subject structure and/or property.

The general home inspection does not include confirmation of the presence of molds of any type. Many types of molds exist to which different people show widely varying levels of sensitivity. Testing for molds requires a specialist inspection. The inspector recommends that you have specialist testing performed if molds are a concern to you. The inspector offers limited mold testing as an ancillary inspection.

 19 – Premier Partners
Structural Engineer

Mold Remediation

Siding Repair

Sewer Inspection Services

Radon Testing

General Contractor

Drone Inspections

Radon Mitigation

Sign Printing, Placement and Storage